Italian company for professional cosmetics operating all over the world.
THE NEED
The company aimed to open numerous stores and had a dual need:
• manage setting up store and unloading goods in time for opening
• quickly eliminate post-set-up waste materials without this operation slowing down the subsequent unloading of goods for sale.
THE SOLUTION
The consultation focused on studying the location of the individual stores and the size of the point of sale, then redefined the choice of vehicles to facilitate unloading. A dedicated operative was made available with maximum availability 24 hours a day, 7 days a week and variable staff according to the quantity of goods/size of the store.
THE BENEFIT
By combining two usually distinct activities (supply and set-up), not a single sales day was lost.